Replacing the main soccer field in our home town Genemuiden

Last updated July 16, 2019

The deal is sealed! The replacement of the main soccer field at Sports Club Genemuiden in our hometown started. Club as well as players were very satisfied about the performance of the old Edel Future DS soccer system for over 9 years.

They played it intensively in the ‘Hoofdklasse‘ (third highest amateur league) in The Netherlands and very much wanted to receive a field again, that could meet the outstanding quality of the old one. On top of that, it also had to offer the latest developments and technology in artificial grass soccer systems. The logic result of these demands was to choose Edel Grass again as their premium artificial turf supplier/contractor for the new field 😉

Edel Future Next

We install a taylor made soccer system and unofficially call it ‘Edel Future Next’. It meets the challenging performance standards and strict environmental regulations of today. To realise this, we used a combination of our unique Edel Future DS and the proven Edel Diamondblade yarn and developed a sand and hybrid EPDM filled soccer system; a mixture of EPDM and hemp. The combination of yarns and materials offer some advantages and make it a truly unique soccer system.

  1. It offers players a natural performing artificial soccer field.
  2. The field is built with recyclable, natural and reused materials.
  3. The infill and a water retaining thatch yarn slightly control the field temperature in warm conditions, keeping the field as cool as possible when irrigated.

Renovation and building process

The header images show the actual status and the official contract signing on the 22nd of June with Bert Hoekman (club board member accomodations), Sjaak Pleijsier (club secretary) and Ralph Teunissen (managing director Edel Grass). We will regularly place a series of images, video’s and updates on this page to show the building process. The complete renovation takes approximately one month.

 


June 25, 2019Removing the infill and gathering it in big bags for recycling.

      


June 26, 2019Cutting the field, separating the remaining infill and rolling up the grass.

      

 


June 27, 2019 – Preparing the shock absorbing sub-base. Cleaning and repairing the shockpad.

        


July 2, 2019 – News item local paper including video, removing old material.

  


July 8, 2019 – Laying out the lines, rolling out the grass, installing the field

   

   


July 9, 2019 – Expeditie Oost – Regional tv station video about the Edel Grass production facility for artificial grass and the new field

Article in dutch: Expeditie Oost – Zo wordt het kunstgras van Sportclub Genemuiden gemaakt


July 11, 2019 – Filling the field with a hybrid infill mixture of EPDM and hemp

    

   


July 11, 2019 – Local TV interview by Expeditie Oost about finishing the installation and infill with Edel Grass project leader Mark van Spriel

   